Fire performance
Supplied without a reaction-to-fire classification.
Our PP hollow board is used for temporary site protection — it is removed before a building is occupied. This page sets out exactly what we can and cannot state, and how we handle a project that names a classification.
What we supply and what we can arrange
What we supply as standard
Products in our site-protection range are supplied as standard without a reaction-to-fire classification. They are intended for temporary use and are removed before the building is occupied.
We are a converter and exporter, not the laboratory that classifies the material. Where a classification is required, it has to be established by a test on the actual configuration.
If your project specifies a classification
Tell us the standard and the class as it is written in your fire strategy or by your main contractor. We will confirm whether the grade can be supplied, confirm lead time, and arrange classification testing to order.
Send the exact requirement from your tender or fire strategy. We do not infer a class from the application.
Our position
What we can state — and what we cannot
| Subject | Our position |
|---|---|
| Standard supply | No reaction-to-fire classification is stated for standard product. |
| Intended use | Temporary site protection, removed before the building is occupied. |
| If a class is required | Tell us the required standard and class; availability is confirmed per order and classification testing is arranged to order. |
| Test report | For a configuration that has been classified, the report is provided on request. No report exists for an unclassified configuration. |
| Material performance | We do not claim a classification, or a specific material performance, for any configuration that has not been tested. |
What to send
What to send with a fire question
- Product, thickness, dimensions and colour.
- Whether the board is removed after the works or stays in the building.
- The exact wording of any classification named in the fire strategy or by the main contractor.
- Where it is installed: external facade line, escape route, enclosed space, or near occupied buildings.
- Whether you need a one-page technical data sheet or a formal test report.
Performance and material documentation is provided on request. For the wider verification approach, see performance and verification.
